The 30 diesel trailer concrete pump is a diesel driven concrete pump trailer with a theoretical output of 30 cubic meters per hour. MINLE brand diesel trailer concrete pump can meet the engineering needs of construction sites without power support and power instability, and bring great convenience to customers. The regular maintenance of concrete pump trailer is very important to keep the diesel trailer concrete pump for longer service time.

In 2014, Vietnamese customer Mr.Vu purchased a 30 diesel trailer concrete pump from MINLE Machinery and invested in a three-year construction project. At that time, the customer requested to purchase three years of wearing parts to complete the construction smoothly. For the service life and maintenance cycle of the 30 diesel trailer concrete pump wearing parts, we have listed a detailed list of customers, and for each replacement of consumable parts, there are detailed instructions.

30 diesel trailer concrete pump wearing parts list

No. Name Quantity Remarks
1 Piston 2/set One year
2 Pendulum Cylinder Seal 2/set One year
3 Spherical Bearing 4/set One year
4 Large Bearing Seal 1/set One year
5 Cutting Ring 1/set One year
6 Rubber Spring 1/set One year
7 S tube short chrome sleeve 1/set One year
8 Discharge seal 1/set One year
9 Stirring Seal 1/set One year
10 Left half shaft 1/set One year
11 Right half shaft 1/set One year
12 Suction Filter 400*100 1/set One year
13 Oil Return Filter 250*20 1/set One year
14 Hydraulic Oil 1/set One year
15 Progressive Distributor 1/set Three year
16 Pendulum Cylinder 2/set Three year
17 Small Bearing 1/set Three year
18 Glasses Plate 1/set Three year
19 S Tube Large Nut 1/set Three year
20 S Tube Large Chrome Sleeve 1/set Three year
21 Oil Filter 1/set
22 Diesel Filter 1/set
23 Air Filter 1/set

Diesel Trailer Concrete Pump Maintenance Period

Item Maintenance Period Note
Diesel Engine Engine Oil & Oil Filter After working 200-250 hours Engine oil replacement time cann’t exceed 12 months
Air Filter 1)Filter element is damaged
2)Filter element clean time is beyond 5 times
Fuel Oil Filter After working 500 hours
Piston 10000m³ If wear heavily, can change it ahead of time
Wear Plate (Glasses plate) 30000m³ If wear heavily, can change it ahead of time
Cutting Ring 10000m³ If wear heavily, can change it ahead of time
Hydraulic Oil One Year If go bad or emulsify, please change all oil and clean the oil tank thoroughly
Oil Suction Filter Element Change it when its pressure gage pointer is in red zone
Oil Return Filter Element Change it when pressure gage pointer is in red zone

For the replacement of wearing parts, detailed pictures and explanations are listed in the manual .
Now is the fifth year for customers to use 30 diesel concrete pumps. The customer contacted us a few days ago and wanted to buy three more consumables for the next project, and gave us a high praise for our concrete pump.

Maintenance of 30 Concrete Pump Exported to Vietnam in 2014
Maintenance of 30 Diesel Trailer Concrete Pump Exported to Vietnam in 2014
Maintenance of 30 Trailer Concrete Pump Exported to Vietnam in 2014

About MINLE Machinery

MINLE Machinery had provided many types of effective and high quality concrete pump machine to over 36 countries. We are designing and manufacturing such concrete pump machines as concrete pump trailer, concrete mixer pump, truck mounted line pump, concrete mixer pump truck, concrete boom pump truck, wet shotcrete machine, etc. we are also providing professional design and fabrication service. OEM and ODM are also available.